House Work

Vas: Now our house is starting to look nice, though there is still a bit of work left which we will be getting to when we can but it’s comfortable and clean. The two main projects left, after the pool of course, which should be up and running in a couple of days, are the living room floor and the tennis court. The floor needs about 90 to 100 square meters of wooden floor replaced. This is no small task and will take a miracle of the Lords’ supply for this to happen. The tennis court is about 360 square meters which needs to be repaved with asphalt or concrete. I’m not sure which ones cheaper but the cost is hefty. tThese two jobs are in the contract stating that we will fix them so we are stepping out on a limb here. I will be starting Bible study in a couple of hours, so pray for me. I will try and take some pics of the house and property so you can see.